OnAugust19,theofficialwebsiteoftheGuangdongProvincialDevelopmentandReformCommissionreleasedthe”HengliPetrochemical(Huizhou)Co.,Ltd.AnnualProduction2.5MillionTonsPTA-2Project”andthe”NationalReviewopinionsontheenergy-savingreportoftheQingyuanShijiaoNaturalGasDistributedEnergyStationProject!
According to the announcement content, Hengli Petrochemical (Huizhou) Co., Ltd. organized and compiled an annual output of 250 The energy-saving report of the 10,000-ton PTA-2 project complies with the relevant specification requirements of the “Guidelines for the Preparation of Energy-saving Reports for Fixed Asset Investment Projects” (2018 version) prepared by the National Development and Reform Commission. The energy-saving commitments made meet the relevant requirements. The energy-saving report of this project is agreed in principle.
The main construction contents of the project include: construction of PTA-2 main device, PTA-2PAC/main device power transformation and distribution room, circulating cooling water station, packaging room and PTA finished product warehouse, etc. The project is designed to produce 2.5 million tons of purified terephthalic acid (PTA) annually. Project energy consumption and main energy efficiency indicators: After the project is completed and put into operation, the annual comprehensive energy consumption will not be higher than 191,024 tons of standard coal (equivalent value), of which the annual natural gas consumption will not be higher than 160 million standard cubic meters, and the annual power supply will be approximately 26.55 million kilowatt hours; the comprehensive energy consumption per unit product of the project is no more than 76.41 kg of standard coal/ton. It is understood that the total investment of the project is RMB 11,494.91 million, of which the project construction investment is RMB 9,899.91 million (including US$120.1 million in foreign exchange). </p